by Christian Vitt

Stapelfeld

Follow the progress of one of EEW Energy from Waste's sustainable projects. We are happy to contribute to the progress!

In the last few weeks, a lot has happened on the building site for the new construction of the waste-to-energy plant (MHKW) and the new construction of a sewage sludge mono-incineration plant (KVA) near Stapelfeld.

The floor slab of the flue gas cleaning system has been concreted and the ceiling of the base building at + 22 metres is finished. Now the construction of supports for the turbine table in the turbine building and the shell of the waste bunker in the northern area are on the agenda.

In addition to the erection of the heavy-duty scaffolding for the bunker pipe, the structural steel erection and the installation of the air heater and the boiler house tensioner have also been completed. The storage yards and storage areas have also been optimised, as the delivery of the new turbine is due soon.

Please find more information about future EEW projects for the energy transition in Stapelfeld at: https://lnkd.in/dpjrkzy

About us

Our company is looking back on a successful building tradition since 1892. Heitkamp stands for the optimal interaction of engineering know-how and constructional realisation.

Contact

HEITKAMP
Industrial Solutions GmbH
Bonsiepen 9 -11
45136 Essen, Germany

+49 (0) 201 / 8 36 90 - 0

+49 (0) 201 / 8 36 90 - 199

Socials

© 2025 HEITKAMP Industrial Solutions GmbH. All Rights reserved.
Settings saved
Privacy settings

Please make a selection to continue
We use cookies and similar technologies to improve your experience on our website. Some cookies are necessary for basic functionality, while others help us analyze usage and optimize our services. For detailed information, please see our privacy policy.

user_privacy_settings_expires

Domain name: heitkamp-solutions.com
Procedure: 30 days
Storage location: Localstorage
Description: Saves the privacy level settings from the cookie consent tool “Privacy Manager.”

user_privacy_settings_expires

Domain name: heitkamp-solutions.com
Procedure: 30 days
Storage location: Localstorage
Description: Stores the storage duration of the privacy level settings from the cookie consent tool “Privacy Manager.”

ce_popup_isClosed

Domain name: heitkamp-solutions.com
Procedure: 30 days
Storage location: Localstorage
Description: Stores that the popup (content element - popup) was closed by a click of the user.

onepage_animate

Domain name: heitkamp-solutions.com
Procedure: 30 days
Storage location: Localstorage
Description: Stores that the scroll script for the one-page navigation has been started.

onepage_position

Domain name: heitkamp-solutions.com
Procedure: 30 days
Storage location: Localstorage
Description: Saves the offset position for the one-page navigation.

onepage_active

Domain name: heitkamp-solutions.com
Procedure: 30 days
Storage location: Localstorage
Description: Saves that the current page is a “one-page” page.

view_isGrid

Domain name: heitkamp-solutions.com
Procedure: 30 days
Storage location: Localstorage
Description: Saves the selected list/grid view in the demo CarDealer / CustomCatalog List.

portfolio_MODULE_ID

Domain name: heitkamp-solutions.com
Procedure: 30 days
Storage location: Localstorage
Description: Saves the selected filter of the portfolio filter.

Eclipse.outdated-browser: "confirmed"

Domain name: heitkamp-solutions.com
Procedure: 30 days
Storage location: Localstorage
Description: Saves the status of the “Outdated Browser” notification bar.
You are using an outdated browser. The website may not be displayed correctly.