We contribute our practical know-how gained from our construction experience to enhance your scheduling and cost management.
Construction planning
Energy is in our DNA - Heitkamp has been a pioneer in the structural realization of energy generation since 1892. For us, the energy transition is therefore a logical consequence of innovation and sustainability. We offer you our expertise in the construction of industrial buildings and plants in your sector.
Waste-to-Energy plants (WtE)
Biomass Plants
Sewage Sludge Plants
Sewage Treatment Plants
Water Treatment Plants
Converter Stations
Peaker Stations
Storage Facilities
Combined Heating and Power (CHP)
Combined Cycle (CCPP)
Hydrogen
Production Plants
Manufacturing Plants
Industrial Buildings
>> 3 Core Competency model –
Civil / Mechanical / Electrical
>> Elimination of the main interfaces
between civils, and the MEP lot
>> Complete C-Part in EPC projects
>> One Stop Solutions – industrial solutions
from greenfield to brownfield to turnkey
>> Bespoke Client oriented solutions packages
>> Partner model – intensive cooperation
over years with reliable alliance partners
>> Focus on repeat business
with satisfied customers
>> Flexible contract conditions
incl. Open Book (NEC Option C)
Hit enter to search or ESC to close
Please make a selection to continue
We use cookies and similar technologies to improve your experience on our website. Some cookies are necessary for basic functionality, while others help us analyze usage and optimize our services. For detailed information, please see our privacy policy.
user_privacy_settings_expires
| Domain name: | heitkamp-solutions.com |
| Procedure: | 30 days |
| Storage location: | Localstorage |
| Description: | Saves the privacy level settings from the cookie consent tool “Privacy Manager.” |
user_privacy_settings_expires
| Domain name: | heitkamp-solutions.com |
| Procedure: | 30 days |
| Storage location: | Localstorage |
| Description: | Stores the storage duration of the privacy level settings from the cookie consent tool “Privacy Manager.” |
ce_popup_isClosed
| Domain name: | heitkamp-solutions.com |
| Procedure: | 30 days |
| Storage location: | Localstorage |
| Description: | Stores that the popup (content element - popup) was closed by a click of the user. |
onepage_animate
| Domain name: | heitkamp-solutions.com |
| Procedure: | 30 days |
| Storage location: | Localstorage |
| Description: | Stores that the scroll script for the one-page navigation has been started. |
onepage_position
| Domain name: | heitkamp-solutions.com |
| Procedure: | 30 days |
| Storage location: | Localstorage |
| Description: | Saves the offset position for the one-page navigation. |
onepage_active
| Domain name: | heitkamp-solutions.com |
| Procedure: | 30 days |
| Storage location: | Localstorage |
| Description: | Saves that the current page is a “one-page” page. |
view_isGrid
| Domain name: | heitkamp-solutions.com |
| Procedure: | 30 days |
| Storage location: | Localstorage |
| Description: | Saves the selected list/grid view in the demo CarDealer / CustomCatalog List. |
portfolio_MODULE_ID
| Domain name: | heitkamp-solutions.com |
| Procedure: | 30 days |
| Storage location: | Localstorage |
| Description: | Saves the selected filter of the portfolio filter. |
Eclipse.outdated-browser: "confirmed"
| Domain name: | heitkamp-solutions.com |
| Procedure: | 30 days |
| Storage location: | Localstorage |
| Description: | Saves the status of the “Outdated Browser” notification bar. |